Participatory M&E and project performance in Uganda, a case of Kijunjubwa safe water project in Masindi district.
Loading...
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Nkumba University
Abstract
The study was to investigate the relationships between participatory monitoring and evaluation (PM&E) and project performance within the context of the Safe Water project, Masindi District. The study was guided by the following objectives; to establish the relationship between stakeholder involvement in participatory monitoring and evaluation and project performance within the Safe Water Project in Masindi District, Uganda, to investigate the relationship between trainings in participatory monitoring and evaluation and project performance within Kijunjubwa the Safe Water Project in Masindi District, Uganda, and to examine the relationship between resource allocation in participatory monitoring and evaluation and project performance within the Safe Water Project in Masindi District, Uganda. A descriptive research design was used. The target population for this study consisted of 200 local community members/ beneficiaries, 12 Project Implementers, 35 Local Leaders and Authorities, 42 Donors and Funding Agencies, 12 technical supervisors and engineers and 8 water source caretakers making a total of 309. 174 out of 309 were derived at using Cochran’s formula. The survey included closed-ended questions with Likert-type scales and interview guides were designed to explore key themes identified in the literature review. Quantitative data analysis involved descriptive statistics to summarize survey responses and inferential statistics while qualitative data from interviews and document analysis were analyzed thematically using a systematic coding process. The study findings indicate that the analysis reveals a very weak and statistically insignificant relationship between stakeholder involvement and project performance, explaining only 0.1% of the variance, a moderate and statistically significant relationship between Resource Allocation and Project Performance (r = 0.354, p = 0.000) and a strong, statistically significant relationship between Organizational Policy and Project Performance (r = 0.562, p = 0.000). Organizational Policy explains 31.6% of the variation in project performance (R² = 0.316). The findings show that stakeholder involvement and PM&E trainings have weak, statistically insignificant effects on project performance in Masindi’s Safe Water Project. In contrast, resource allocation has a moderate, significant positive impact, while organizational policy demonstrates a strong and statistically significant influence. The study recommended that there is need for continuous community involvement throughout the project cycle, starting from inception, with proper sensitization and mobilization.
Description
A Dissertation Submitted to the School of Social Sciences in Partial Fulfilment of the Requirements for the Award of a Masters Degree in Monitoring and Evaluation of Nkumba University
Citation
Mubangizi, P. (2026). Participatory M&E and project performance in Uganda, a case of Kijunjubwa safe water project in Masindi district, Nkumba University