Cost management approaches and operational performance of projects in Uganda: a case study of Isimba hydropower project.
| dc.contributor.author | Kandari, Pius Oscar | |
| dc.date.accessioned | 2026-10-05T13:37:37Z | |
| dc.date.issued | 2026-10 | |
| dc.description | A Dissertation Submitted to the School of Business Administration in the Partial Fulfillment of the Requirements for the Award of a Degree of Master in Business Administration of Nkumba University | |
| dc.description.abstract | The study examined the effect of cost management approaches on operational performance of projects in Uganda, using the Isimba Hydropower Project as a case study. The study objectives were; to assess the influence of cost planning on operational performance of Isimba Hydropower Project, to determine the effect of cost control and monitoring on operational performance of Isimba Hydropower Project and to examine the relationship between cost estimation and operational performance of Isimba Hydropower Project. The study adopted a sequential explanatory approach using a cross-sectional case study design focusing on the Isimba Hydropower Project to examine the relationship between cost management approaches and operational performance. From a study population of 80 employees selected from key project departments, a sample of 67 respondents was determined using the Yamane (1967) formula and selected through purposive and simple random sampling. Both primary and secondary data were collected using structured questionnaires, interview guides, and document review checklists. Quantitative data were analyzed using SPSS Version 24 to generate descriptive and inferential statistics, including frequencies, percentages, means, standard deviations, Pearson correlation, and regression analysis, while qualitative data were analyzed thematically and presented narratively. The study established that cost planning, cost control and monitoring, and cost estimation positively influence the operational performance of the Isimba Hydropower Project, with respondents reporting high levels of agreement across all study variables. Correlation and regression analyses confirmed that cost planning (r = 0.263, p = 0.042), cost control and monitoring (r = 0.342, p = 0.008), and cost estimation (r = 0.517, p = 0.000) each have a statistically significant positive effect on operational performance, with cost estimation exhibiting the strongest influence. The study further found that the project's operational performance was generally high, characterized by timely completion of activities, budget adherence, effective resource utilization, quality service delivery, stakeholder satisfaction, and sound risk management. Consequently, the study recommends that UEGCL, the Ministry of Energy and Mineral Development (MEMD), contractors, and oversight agencies strengthen cost planning, expenditure monitoring, and cost estimation practices through realistic budgeting, real-time financial monitoring, advanced estimation techniques, and sector-specific cost management standards. These measures will enhance accountability, operational efficiency, value for money, and the long-term sustainability of Uganda's large-scale infrastructure projects. | |
| dc.identifier.citation | Kandari P. S.(2026). Cost management approaches and operational performance of projects in Uganda: a case study of Isimba hydropower project. Nkumba University | |
| dc.identifier.uri | https://ir.nkumbauniversity.ac.ug/handle/123456789/467 | |
| dc.language.iso | en | |
| dc.publisher | Nkumba University | |
| dc.subject | Cost management approaches | |
| dc.subject | Operational performance | |
| dc.subject | Isimba hydropower | |
| dc.title | Cost management approaches and operational performance of projects in Uganda: a case study of Isimba hydropower project. | |
| dc.type | Thesis |